| |
Incentives
: |
| 1. |
Power
Subsidy : |
| |
Subsidy
on power tariff will be provided at the rates
of 30% and 25% for connected loads upto 2 MW and
above 2 MW respectively for a period of 5 years
from the date of commercial production subject
to a maximum ceiling limit of Rs.2 lakh annually.
This will be a reimbursement scheme on a actual
consumption of power for manufacturing process
substantiated with requisite details.
|
| 2. |
Drawal
of Power Line : |
| |
Cost
of drawal of 33/11 KV line to eligible industrial
unit shall be reimbursed subject to a ceiling
of Rs.2.00 lakh provided the location is outside
the notified developed infrastructure and is provided
by the Government. This subsidy shall be available
only once to the eligible unit.
|
| 3. |
Subsidy
for Feasibility Study Cost : |
| |
Subsidy
will be available at the rate of 50% of the cost
of Detailed Reports subject to a ceiling of Rs.1.00
lakh, which shall be eligible only for new units
with investment in plant & machinery above Rs.25
lakh provided the report is prepared by a Government
approved Industrial Consultants.
|
| 4. |
Manpower
Subsidy : |
| |
Government
will reimburse upto 25% of the actual wage bill
for local tribal employees employed by eligible
units upto three years from the date of entertainment
subject to a maximum ceiling of Rs.1.00 lakh annually.
This grant would be for a period of five years
from the date of entertainment of such staff and
would be given to those units where the investment
in plant & machinery exceeds Rs.10.00 lakh and
the number of employees engaged in the unit exceeds
20 (twenty) numbers and where the at least 50%
of the employees are local tribal youth. Units
availing subsidy under this scheme shall take
all effective steps to ensure 75% employment of
local youth over a period of five years. This
subsidy will be admissible on reimbursement basis
for only those employees who complete one year
of regular employment in the unit.
|
| 5. |
Subsidy
Incentives for 100% Export Oriented Units
(EOU) : |
|
An additional 5%
capital investment subsidy subject to a maximum
ceiling of Rs.3.00 lakh. |
| 6. |
Subsidy
for Quality Control measures : |
| |
Cost
of laboratory equipment for the purpose of quality
control and ISI/BIS/ISO 9000 certification will
be reimbursed subject to a maximum ceiling of
Rs.50,000/- in cases where it does not form part
of the project cost for SSI and Rs.1.00 lakh in
case of Large & Medium unit.
|
| 7. |
Stamp
Duty Exemption : |
| |
50%
Stamp Duty and Registration Fee for securing loans
from Financial Institutions including Mortgage
of fixed assets shall be exempted from the Stamp
Duty Act for a period of 5 (five) years.
|
| 8. |
Price
Preference : |
| |
Price
preference of 15% and exemption of Earnest Money
for purchases shall be admissible to all eligible
units under Govt. Store Purchase Program.
|
| 9. |
Stipendary
Support for EDP : |
| |
Stipend
at the rate of Rs.500/- per month per trainee
shall be provided for training of 100 youth annually
for special EDP to be conducted by Govt. approved/recognized
Institutions subject to the conditions that the
training period shall not be less than 3 months
duration.
|